We deliver full plant and system relocation programs — from dismantling through recommissioning — under one technical responsibility model.
Preserve Value • Reduce CAPEX • Restore Performance
"Relocation is not transport. It is re-engineering."
Detailed asset audit, condition report, and feasibility study before any tool is lifted.
Digital inventory tagging, electrical disconnection map, and preservation packaging.
Safe logistics coordination while simultaneously re-engineering layout for new site.
Foundation modifications, interface adaptation, and precision mechanical erection.
Dry and wet commissioning, logic verification, and safety interlock checks.
Performance verification, operator handover, and production ramp-up.
Reduced via reuse
Shorter start-up
Restored / Improved
Optimized
Asset Extended
Traditional Relocation
Our Relocation
"We don’t stop when the system is installed. We stop when it works."
Explore our relocation solutions in action
Dismantling, tagging, preservation, layout re-engineering, and recommissioning.
View Case Study
Fast-track dismantling and re-installation for infrastructure projects.
View Case Study
Complete asset re-engineering and redeployment programs.
View Case Study
They are under-engineered for their new reality. Let's fix that.