Predictable delivery is not luck. It’s governance.
We deliver engineered schedules, disciplined procurement, verified quality, and audit-ready documentation.

Single Baseline Controlled Change Verified Handover

Expansion projects fail when control is weak.

Not when effort is low.

The Surprise Drivers

  • Unclear interfaces between trades
  • Procurement sequencing delays
  • Late design changes & rework
  • Uncontrolled site decisions

The EPC Control

  • Single-point interface ownership
  • Engineered procurement schedules
  • Change control governance
  • Method-driven site execution

"Our EPC model is built to prevent surprises — before they appear."

What We Control (So You Don't Have To)

Engineering Governance

Prevents design errors & rework through constructability reviews.

Procurement Sequencing

Prevents long-lead delays by aligning supply with site need.

Method-Driven Execution

Prevents unsafe or inconsistent work via approved methods.

Commissioning Discipline

Prevents unstable operation at handover through verified testing.

The EPC Delivery Flow

1

Define

2

Engineer

3

Procure

4

Fabricate

5

Install

6

Test

7

Verify

Handover

Entry Criteria Gate Approvals Baseline Tracking

Inside the EPC Package

A) Engineering & IFC Documentation

  • Detailed design coordination
  • IFC drawing packages
  • Interface register & buildability checks
  • Method statement alignment

B) Procurement & Fabrication

  • Vendor technical evaluation
  • Submittal & compliance control
  • Long-lead identification
  • Fabrication QA/QC checkpoints

C) Construction Execution

  • WBS-based execution planning
  • Discipline coordination (Steel/MEP)
  • Daily supervision & tracking
  • Controlled site methods

D) Quality & Commissioning

  • Inspection & Test Plans (ITPs)
  • Non-conformance loop
  • Functional verification
  • Final acceptance package

Where This Model Fits

Best For

  • Expansion projects & phased delivery
  • Industrial facilities & support buildings
  • Infrastructure & utility packages
  • Consultant/Authority approvals required

Not Ideal When

"Scope is undefined or decisions are still moving daily."

(This honesty increases trust.)

The Engineering Value

Reduced Design-to-Execution Gaps

Buildable IFC packages + Constructability checks.

Controlled Baselines

WBS planning + Procurement-linked sequencing.

Audit-Ready Documentation

ITPs, NCR control, As-builts, Testing evidence.

"We don’t push work to finish. We govern delivery to succeed."

Received at Handover

  • IFC & As-Built Drawings
  • Test Records & Certs
  • Commissioning Reports
  • QA/QC Dossiers
  • O&M Manuals & Training
  • Closeout & Compliance Pack

If it’s not documented, it’s not delivered.

Related Projects

Explore our EPC delivery solutions in action

Predictable. Controlled. Delivered.

If your project must be predictable — choose EPC delivery built on control.

Response includes scope clarity, schedule outline, and delivery risks — not sales talk.